Skip to main content

Rowing tour

  • Location
    Souston (40)
  • Engineering office
    Massy & Sons
  • Photographer
    David Aubert

Work carried out with

The materials used are technical products and must be installed according to professional standards. We recommend that the installation be carried out by a professional.

Built at Pointe des Vergnes, the finish tower has proven its effectiveness for the rowing league championship. This wooden-covered structure (Rythmix profile)® 40×40 mm square preserved brown) fits perfectly into the environment. It's a visual success!